Operation over 3 working shifts with 8 persons, requiring feedstock (about 42 MT/h) to be supplied through a pipeline or from a storage tank installed on site. The required land area is about 10’000 m2. Required are water connection, sewage connection, and power supply 380/400 V with backup generator (with heavy voltage supply 10,000 V nearby). Infrastructure: storage tank for the refined product, fencing, entrance gate, access road, exit road, turning and parking spaces, site lighting, telephone connection with internet, shelter guard, storage hall covered, storage yard uncovered, fully equipped workshop with spare parts, building for crew (dressing, breaks, food), kitchen, first aid room, office, laboratory, waste container with waste separation, cabinets for safety equipment, office and controller container next to the plant, airconditioning systems in buildings where necessary. The equipment parts must all be grounded and comply with the lightning protection requirements